IH-10 At Martinez Creek, Capital Excavation, San Antonio
Mr. Thompson served as Project Manager for the $4.5M construction project which encompassed three project locations. The work widening an existing bridge structure. Removing and replacing an existing bridge structure, and widening and existing steel bridge structure. This project had some unusual aspects in that it included raising an existing structure at IH-10 at FM 1518, and replacing the existing steel pedestals and elastomeric bearing pads. In addition, the new bridge structure, which was constructed at IH-10 at Martinez Creek, included the construction of an abutment tie-back system.