Timberhill Drive Low Water Crossing, Capital Excavation

Mr. Thompson served as the Project Manager for the construction project to provide a new bridge at the site of the existing Timberhill Drive low water crossing near the intersection of Timberhill Drive and Wurzbach Road. The project included foundations and superstructure for the new bridge, as well as HMAC paving, drainage structures and sidewalks.