Atlas served as the Principal Engineer, project manager, design engineer, and drafter for update of the existing site plan in order to include the addition of a 10K SF warehouse facility with associated utilities. The project included water and waste water utility design, temporary traffic control plans, and erosion and sedimentation plans.