IH 35 At Salado Creek Bridge Widening, Capital Excavation

Mr. Thompson was the Project Manager for the $2.7M construction project to widen the north and southbound bridge structures on IH 35 over Salado Creek. The project included additional drilled shaft foundations, precast concrete beams, precast concrete bridge panels, and HMAC paving.