Ellington Field Taxiway Hotel Rehabilitation

Mr. Thompson served as a project engineer and drafter on the project to collect and analyze Falling-Weight-Deflectometer (FWD) data and create crack maps for the rehabilitation of Taxiway A, B, C, D, E, F, and H at the Ellington Field facility. The data collection was coordinated and performed while maintaining full operational capability for the National Guard, NASA, and General Aviation aircraft operations at the facility.